TL;DR

  • BUS grant of £7,500 toward an air-source heat pump applies in B61 (Bromsgrove) (England).
  • Median EPC band across 7,378 local properties: D.
  • 53% of homes sit at band D or below — typical retrofit candidates.
  • Top property band in B61 (Bromsgrove): D (40%).
  • MCS-certified installer required for a binding heat-loss quote.

What the EPC data shows for B61 (Bromsgrove)

We’ve aggregated the current Energy Performance Certificate band for 7,378 properties in B61 (Bromsgrove), drawn live from the GOV.UK EPC Register. The median home in our sample sits at band D, with 40% falling into band D and 31% in band C. Around 53% of homes are at band D or below — the cohort with the most realistic retrofit upside.

EPC band distribution across 7,378 properties in B61 (Bromsgrove)
BandPropertiesShareRetrofit context
Band A1712.3%Already exceptional; heat pump replaces fossil heat directly
Band B1,01413.7%Strong fabric; heat-pump-ready after minor checks
Band C2,25430.6%Typical retrofit candidate; small upgrades likely
Band D2,91139.5%Insulation prerequisites likely; well-suited post-upgrade
Band E86411.7%Insulation recommendations typically required for BUS
Band F1311.8%Significant fabric improvements before heat pump fit
Band G330.4%Fabric-first retrofit before any heat-pump consideration
EPC band distribution across 7,378 properties in B61 (Bromsgrove)Source: GOV.UK EPC Register. Sample collected 2026-05-14.

The typical B61 (Bromsgrove) home

What the EPC data shows beyond the headline rating — useful context for sizing a heat-pump install.

  • Floor area: median 83 (25th–75th percentile: 67106 m²). Heat-pump sizing scales roughly with floor area — expect a 5–8 kW unit at the median.
  • Current heating cost: median £669/yr 413– £937 typical range). The number an installer’s running-cost saving projection sits against.
  • Mains gas connection: 88% of properties. Most homes are replacing a working gas boiler — the payback case depends heavily on tariff choice + smart scheduling.
  • Property type mix: Detached 31%, End-Terrace 12%, Mid-Terrace 17%, Semi-Detached 37%.
  • Dominant age band: England and Wales: 1967-1975 (15% of homes). Sets the fabric-first work expected before commissioning.

Does the Boiler Upgrade Scheme apply in B61 (Bromsgrove)?

Yes. B61 (Bromsgrove) is in England, where the Boiler Upgrade Scheme (BUS) pays £7,500 toward an air-source heat pump install. The grant is administered by Ofgem and deducted by the installer at the point of invoice — you never see the cash. To qualify, the property must be owner-occupied or privately rented, have a valid EPC issued in the last 10 years, and have no outstanding loft-or-cavity insulation recommendation on the EPC (unless an exemption is documented). In our sample of B61 (Bromsgrove) EPCs the median rating is band D, which means most homes need to clear at least one insulation recommendation before the installer can claim the grant.

Typical install cost in B61 (Bromsgrove)

Pre-grant install costs in B61 (Bromsgrove) typically run £8,000 to £14,000 for a 5–10 kW air-source unit, in line with UK averages — labour rates in E12000005 sit close to the national mean. After the £7,500 BUS deduction most B61 (Bromsgrove)homeowners pay £1,500 to £6,500 out of pocket. The figure within that range that applies to your property depends on three things: heat-loss sizing (set by floor area, fabric and air-tightness), radiator upgrades (most pre-2000s homes need at least one or two changed), and hot-water cylinder provision. An MCS-certified engineer issues the binding quote after a heat-loss calculation per BS EN 12831.

What this means for your home

Whether a heat pump is a good fit for your specific home in B61 (Bromsgrove)depends on three factors the EPC alone can’t answer: roof + outdoor space for the external unit, radiator sizing throughout the heating circuit, and your current heating fuel + tariff. Propertoasty’s free pre-survey check combines your address, an EPC pull, the Google Solar API’s roof data, and a floorplan vision analysis to produce an installer-ready report — typically takes about five minutes.

Run a free pre-survey check on your home — installer-ready report, BUS-eligibility verdict, sizing range, and a list of MCS-certified installers covering B61 (Bromsgrove).

How B61 (Bromsgrove) compares

Compared with the England + Wales average band-D share of roughly 45%, B61 (Bromsgrove)’s 40% sits below the national midpoint. Bands E and worse — typical pre-1930s homes without significant retrofit — make up 14% of the local sample, which compares to the E&W average of around 22%.

Sources

  1. GOV.UK — Boiler Upgrade Scheme — accessed May 2026
  2. Ofgem — Boiler Upgrade Scheme guidance — accessed May 2026
  3. MCS — Find an installer — accessed May 2026
  4. GOV.UK — Find an energy certificate (EPC Register) — accessed May 2026
  5. Energy Saving Trust — Air source heat pumps — accessed May 2026

EPC aggregate data contains public sector information licensed under the Open Government Licence v3.0 (© Crown copyright and database right).