Guides

Heat pump + solar guides for UK homeowners in 2026

By Jim FellLast updated:

TL;DR

  • Nine production guides covering BUS application, MCS site visits, fabric-first retrofit, hot-water planning, smart-tariff setup, running costs, SCOP/COP/SPF, MCS 020 noise, and payback.
  • Every guide uses 2026 UK numbers and current Ofgem / MCS rules.
  • Aimed at homeowners 1–3 months from commissioning an install (or freshly commissioned).
  • Pair these with the comparison pages at /compare for technology decisions.

Pick a guide

Each guide answers a specific practical question about the UK heat-pump install process. Read the one that matches your current stage — or all of them if you’re still figuring out the order.

Looking for technology comparisons instead?

Guides cover the PROCESS of installing a heat pump or solar system. If you’re still deciding between technologies (heat pump vs gas boiler, air-to-water vs air-to-air, Daikin vs Mitsubishi etc.), the comparison pages at /compare work through those decisions side by side.

More guides

More homeowner guides land here as we write them. If there’s a specific stage of the heat-pump or solar install process you’d like covered, let us know via the contact link.