E12000008 · England
Heat pumps across HP16 (Great Missenden) postcode area: 2026 grant + cost guide
TL;DR
- BUS grant of £7,500 toward an air-source heat pump applies in HP16 (Great Missenden) (England).
- Median EPC band across 2,920 local properties: D.
- 65% of homes sit at band D or below — typical retrofit candidates.
- Top property band in HP16 (Great Missenden): D (42%).
- MCS-certified installer required for a binding heat-loss quote.
What the EPC data shows for HP16 (Great Missenden)
We’ve aggregated the current Energy Performance Certificate band for 2,920 properties in HP16 (Great Missenden), drawn live from the GOV.UK EPC Register. The median home in our sample sits at band D, with 42% falling into band D and 29% in band C. Around 65% of homes are at band D or below — the cohort with the most realistic retrofit upside.
| Band | Properties | Share | Retrofit context |
|---|---|---|---|
| Band A | 21 | 0.7% | Already exceptional; heat pump replaces fossil heat directly |
| Band B | 159 | 5.4% | Strong fabric; heat-pump-ready after minor checks |
| Band C | 844 | 28.9% | Typical retrofit candidate; small upgrades likely |
| Band D | 1,226 | 42.0% | Insulation prerequisites likely; well-suited post-upgrade |
| Band E | 502 | 17.2% | Insulation recommendations typically required for BUS |
| Band F | 138 | 4.7% | Significant fabric improvements before heat pump fit |
| Band G | 30 | 1.0% | Fabric-first retrofit before any heat-pump consideration |
The typical HP16 (Great Missenden) home
What the EPC data shows beyond the headline rating — useful context for sizing a heat-pump install.
- Floor area: median 109 m² (25th–75th percentile: 78–168 m²). Heat-pump sizing scales roughly with floor area — expect a 5–8 kW unit at the median.
- Current heating cost: median £938/yr (£607– £1,443 typical range). The number an installer’s running-cost saving projection sits against.
- Mains gas connection: 72% of properties. Mixed grid: heat-pump payback runs much shorter for the off-grid minority (oil / LPG).
- Property type mix: Detached 50%, End-Terrace 10%, Mid-Terrace 16%, Semi-Detached 22%.
- Dominant age band: England and Wales: 1967-1975 (21% of homes). Sets the fabric-first work expected before commissioning.
Does the Boiler Upgrade Scheme apply in HP16 (Great Missenden)?
Yes. HP16 (Great Missenden) is in England, where the Boiler Upgrade Scheme (BUS) pays £7,500 toward an air-source heat pump install. The grant is administered by Ofgem and deducted by the installer at the point of invoice — you never see the cash. To qualify, the property must be owner-occupied or privately rented, have a valid EPC issued in the last 10 years, and have no outstanding loft-or-cavity insulation recommendation on the EPC (unless an exemption is documented). In our sample of HP16 (Great Missenden) EPCs the median rating is band D, which means most homes need to clear at least one insulation recommendation before the installer can claim the grant.
Typical install cost in HP16 (Great Missenden)
Pre-grant install costs in HP16 (Great Missenden) typically run £8,000 to £14,000 for a 5–10 kW air-source unit, in line with UK averages — labour rates in E12000008 sit close to the national mean. After the £7,500 BUS deduction most HP16 (Great Missenden)homeowners pay £1,500 to £6,500 out of pocket. The figure within that range that applies to your property depends on three things: heat-loss sizing (set by floor area, fabric and air-tightness), radiator upgrades (most pre-2000s homes need at least one or two changed), and hot-water cylinder provision. An MCS-certified engineer issues the binding quote after a heat-loss calculation per BS EN 12831.
What this means for your home
Whether a heat pump is a good fit for your specific home in HP16 (Great Missenden)depends on three factors the EPC alone can’t answer: roof + outdoor space for the external unit, radiator sizing throughout the heating circuit, and your current heating fuel + tariff. Propertoasty’s free pre-survey check combines your address, an EPC pull, the Google Solar API’s roof data, and a floorplan vision analysis to produce an installer-ready report — typically takes about five minutes.
Run a free pre-survey check on your home — installer-ready report, BUS-eligibility verdict, sizing range, and a list of MCS-certified installers covering HP16 (Great Missenden).
How HP16 (Great Missenden) compares
Compared with the England + Wales average band-D share of roughly 45%, HP16 (Great Missenden)’s 42% sits below the national midpoint. Bands E and worse — typical pre-1930s homes without significant retrofit — make up 23% of the local sample, which compares to the E&W average of around 22%.
Sources
- GOV.UK — Boiler Upgrade Scheme — accessed May 2026
- Ofgem — Boiler Upgrade Scheme guidance — accessed May 2026
- MCS — Find an installer — accessed May 2026
- GOV.UK — Find an energy certificate (EPC Register) — accessed May 2026
- Energy Saving Trust — Air source heat pumps — accessed May 2026
EPC aggregate data contains public sector information licensed under the Open Government Licence v3.0 (© Crown copyright and database right).